About this project
With the shower open to the studs, we leveled the walls, built a new waterproof shower from the studs out, and finished it with a custom glass enclosure, so one crew was responsible for everything from the studs to the glass.
A pebble floor has a lot of grout joints, so the waterproofing underneath has to be right: the pan is a traditional mortar bed sloped to the drain and covered with Schluter® KERDI, and it held water during the flood test before a single stone was set. The black granite curb went on top of the membrane, not through it.
The niche edges are mitered instead of finished with metal trim, so the tile wraps cleanly into the opening. The glass was measured after the tile was finished and installed by our own crew. See the types of shower glass we install, or price your shower.
Project gallery
Hydroblock foam panels on the walls, a mortar-bed pan sloped to the drain, then Schluter® KERDI over the pan with every seam and corner banded. The shower was flood-tested before any tile went down.



River-stone mosaic set on the pan, then an Absolute Black granite slab curb set level on top of the waterproofing.


Green glossy stick tile run vertically in a 30/70 offset with a leveling system, and a large double niche with a river-stone back, black granite shelves and mitered tile edges.