These are the questions homeowners ask us most often. Don't see yours? Use the form at the bottom of this page — no name or email required. We answer new questions here so the next homeowner can read them too.
It depends on the size of the room, how much changes (layout, plumbing locations, curbless or standard shower) and the materials you choose. Instead of a rough range, we visit the house, measure, and give you a written fixed-price estimate. The estimate is free, and the price changes only if you change the scope.
No. Our estimate is a fixed price for the agreed scope. If you decide to add or change something during the project, we price that change in writing before doing it — no surprises on the final invoice.
A curbless (zero-threshold) shower has no step: the shower floor continues the bathroom floor and slopes gently to a drain, usually a linear drain. To do it right, the floor under the shower has to be lowered or the mortar bed built up so the slope (about ¼ inch per foot) works and the finished tile ends flush with the rest of the room. Whether your bathroom can have one depends on the floor framing and drain location — we check that during the site visit. Curbless showers are our specialty.
Every wet area we build sits inside one continuous waterproof system: Hydroblock foam panels or KERDI-Board on the walls, Schluter® KERDI membrane over a traditional sloped mortar-bed shower pan, Schluter® DITRA or DITRA-HEAT under floor tile, KERDI-BAND at every floor-to-wall seam and Laticrete Hydro Ban around pipes and valves. Tile and grout are not waterproof by themselves — the membrane underneath is what keeps water out of the walls.
It depends on the scope: a tile refresh is much faster than a full rebuild with new framing, plumbing locations and a curbless shower. Mortar beds and waterproofing also need curing time that should not be rushed. You get a schedule together with the estimate, and we plan material orders early so the crew is not waiting on deliveries. On our recent Seattle primary bathroom, we finished ahead of the homeowner's deadline.
The work is done by our own crew — demolition, framing and subfloor repair, waterproofing, tile and stone, finish work. You always know who is in your house and who is responsible for the result.
Yes. General Forms LLC is a Washington general contractor, License #GENERFL838J6, with a $30,000 contractor bond and $1,000,000 in general liability insurance. You can verify the license, bond and insurance on the Washington L&I "Verify a Contractor" lookup.
Seattle, Bellevue, Kirkland, Redmond, Mercer Island and the greater Puget Sound area. We are based in Tacoma and have completed projects from Marysville to Olympia.
A few photos of the room, rough measurements if you have them, and any inspiration pictures or tile you already like. Tell us what bothers you about the current space and what must stay (for example, a tub platform or a window). The more we know, the more accurate your fixed-price estimate will be.
Yes. Our installation is covered by a lifetime workmanship warranty: we stand behind our work for as long as the installed materials themselves last. Tile, stone, fixtures and other materials also carry their manufacturers' warranties.
Payments follow the work: a 30% deposit to order materials and schedule the job, then 30% and another 30% as the work progresses, and the final 10% only after we walk through the finished project together and you approve it.
Most bathroom and kitchen remodels that move plumbing or electrical need a permit from your city. We tell you during the estimate whether your project needs one and handle the permit process for projects that require it.
Both. We install natural stone for fireplaces, showers, floors and outdoor spaces, as well as porcelain, ceramic, terrazzo and large-format tile and slabs.
As little as possible. Our tile and stone grinders are connected to a Hilti dust extractor that captures dust at the source, we run an air scrubber during demolition and cutting, and our carpentry tools work with a HEPA extractor. We also protect floors and close off the work area.