Behind the Tile — The Prep Work That Makes It Last

The most important parts of a tile job end up hidden behind the finish.

A look at the steps you don't see in finished photos: heated floor systems, clean cuts around drains and niches finished with care.

Heated floors

Uncoupling membrane with heating cables before floor tile
Electric floor heating cables laid before tile

Clean cuts around drains

Hexagon mosaic cut cleanly around a square shower drain
Black mosaic shower floor around a protected drain during installation

Finished niches

Shower niche finished with mitered edges and mosaic back
Recessed niche with clean tile cuts in a subway tile wall

More About this project

What happens first

  • Heated floor cables set in an uncoupling membrane
  • Drains set to the correct height and slope
  • Niches framed and waterproofed before tile

Why it matters

Shortcuts in preparation show up later as cracked tile, loose grout or leaks. We follow TCNA guidelines and manufacturer instructions on every job.